I would have loved to have got the carpeting done next month on the pROJECT mAYHEM build but it has become apparent that there are way too many other things to do before that. I seem to be at the stage where one thing depends on another thing being in place which usually requires a third thing to be sorted before you can make progress.
The revised plan that I have now come up with is:
The revised plan that I have now come up with is:
- Finish cutting out the interior panels in rough form.
- Fit leisure battery and split charger.
- Fit the fuse box for the electrics and install the reversing camera.
- Remove the roof lining and cover that, carpet the interior, carpet the sub woofer\amp enclosure, get the lights ready to go in and the tweeters installed.
- Insulate behind the panels, under the roof lining and run in speaker cables and wiring for lights in rear doors.
- Wire up the rest of the lights and switches, the sub\amp enclosure and speakers and fit all the above.
- Build the sleeping platform\storage.
No comments:
Post a Comment