Rambling on about climbing stuff, cooking stuff, van stuff, other stuff and occasionally just stuff.
Sunday, May 31, 2009
Italy Days 1-4
Italy eventually...
Monday, May 25, 2009
Caley
Considering that it was turning out to be the hottest day of the year so far conditions were pretty good in the woods but a quick trip to look at Chickenheads proved that anything that had been in the sun was not going down without a fight. For me it was more of a fight than I was prepared to put up taking into consideration I have got a flight booked to Italy for tomorrow morning.
Nice to go to a new crag though and as an added bonus it is only eight or ten miles from my mates house - I think that the autumn could be rather productive for the Yorkshire gritstone...
Friday, May 22, 2009
pROJECT mAYHEM II
Method 1. The sport climbing (redpoint) method:
- Plan everything out meticulously leaving nothing to chance.
- Buy the materials to implement the plan.
- Execute successfully with a minimum of fuss.
Method 2. The trad climbing (onsight) method:
- Sketch out a quick plan.
- Buy some materials.
- Faff about.
- Revise the plan.
- Buy some more materials.
- Faff some more.
- Revise the plan some more.
- Execute with a lot of fuss and realise that you still have 90% of the materials left.
I chose the trad method - the end result was the same - I ended up with a van with a floor fitted as intended. However I don't think it would have been half as interesting, or enjoyable, had I chosen the sport method just because there is something so satisfying about solving things on the fly. Having said that there one thing I would do differently next time - make sure I have enough money left to buy a beer when it is all over as a day doing trad without a beer at the end of it is just ever so slightly wrong.
Tuesday, May 19, 2009
pROJECT mAYHEM
"You never know I might even have half a clue what I am doing come the end of the project!!"
These proved to be prophetic words - after what was at times the hardest four days of my life I finally have the floor down....
For now I will just post some pics and random comments up but I will go into a bit more detail on what has already been a fucking huge learning curve later.
Start off with an empty van like this:
I had already made up my mind to avoid drilling into the floor pan as it was going to be a right royal pain in the arse crawling under the van to seal all the screw holes that would result if I did. Instead I devised a cunning plan to tie the frame into the haulage loops (or whatever the proper name for them is). To be honest this really worked out well - short of a nuclear explosion there is no way that the frame will ever move.
Get the first board fitted - this was on the third day!! That's correct - two days to create and fit the frame and put in the insulation though to be fair I was somewhat hungover on the second day...
Finally after four days and a lot of cursing and the like finish off boarding out the floor.
I should point out that somewhere between my last blog and the start of the boarding out process I had decided that this project was going to be called "Project Mayhem". There was no real reason for this other than I liked the name (and besides it pays homage to the truly excellent Fight Club). Still I suppose that if you are going to call it something like that then you really can't complain too much when it all goes a bit tonto... 8-)
Thursday, May 14, 2009
Crooked Rain Crooked Rain

Tuesday, May 5, 2009
Necessary lobotomy?
As you can probably guess it has not been the busiest day at work I have ever had...